What a rebar shop drawing is, and why the field treats it as the instruction manual
What a rebar shop drawing is, and why the field treats it as the instruction manual
When a bundle shows up and nobody is sure where it goes, the foreman pulls the shop drawing. Not the engineer's structural set, the shop drawing. Here is what it is, what is in it, and why your crew should work from it.
The gap the structural drawings leave
The engineer of record designs the concrete. The structural drawings and general notes say what the member needs: bar sizes, spacing, cover, laps. That is the design intent.
What they do not give you is a build list. They do not tell the shop how many bars to cut, how long each one is, or what shape it bends into. They do not tell your crew which bar goes where in a footing, a grade beam or a wall. The detailer turns the design into pieces you can cut, tag, haul and place. The result is the shop drawing set.
What is in a shop drawing set
A set has a few parts, and each one has a different reader.
Placing drawings. Plans, elevations and sections that show where each bar sits and which mark it carries. This is the sheet your crew has open at the footing.
The bar list. Every mark with its size, quantity, cut length and shape. This is what the benders cut and bend from. Size means the bar number: a #4 is four eighths of an inch in nominal diameter, and weight per foot follows from the size, which is how tonnage gets figured.
Bending details. For each bent shape, the leg dimensions and angles, so a hook or a stirrup comes off the bender the way the design called for.
How a bar mark works
Every bar in the set gets a mark. On the bundle there is a tag with that mark. On the placing drawing, the same mark points to where the bar goes. Your ironworker reads the tag, finds the mark on the sheet, and sets the steel. Nobody has to guess or measure a bar to figure out what it is.
Mark systems vary from one detailer to the next, so read the key on your own set rather than assuming.
Why approval comes before cutting
On most jobs the shop drawings go out for review before any steel is cut, to the general contractor and, where the job calls for it, the engineer. Once they come back approved, the shop fabricates from that set. That is the reason the field should build from it too: the approved set is what the steel on the truck was made from. If a crew places from an old copy or from the design drawings alone, the tags will not line up with what they are looking at.
Two habits save grief.
- Check the revision date on the sheet before the crew starts. A set that was current last month may not be current now.
- When the plans change, send the revision to the fabricator right away. Steel that has not been cut can be changed on paper. Steel that has been cut and bent has to be dealt with another way.
Where a shop drawing earns its keep
Many rebar problems on a pour are drawing problems that surfaced late. A bar too short to make its lap. A stirrup that will not fit the beam it was drawn for. A conflict between the structural and architectural sheets that nobody caught until the forms were up. Detailing is where those get found, while it is still a phone call and not a delay.
A shop drawing also does not replace the engineer. It carries out the engineer's design. If you think something on the set conflicts with the structural drawings, or you want to change a bar, spacing or cover, that question goes to the engineer of record, not to the detailer or the crew.
Next step
River City Reinforcing does detailing and estimating in-house, on aSa software, and the same drawings run the shop that cuts your steel. You can read how that works on our shop drawings page. If you have a set of plans ready, send them to us, or call the office at (210) 775-0609.