Skip to content

20-foot or 40-foot rebar: when each one saves you money

River City Reinforcing · November 23, 2026 · 3 min read

20-foot or 40-foot rebar: when each one saves you money

Every estimator hits this one when a job gets priced: 20-foot bar or 40-foot bar? Neither is better on its own. The right length depends on how long your runs are, what lengths your crew will cut, and how the steel gets from the yard to the form.

Start with what does not change. A #4 bar weighs 0.668 lb per foot (the ASTM A615 standard value). That makes a 20-foot stick 13.36 lb and a 40-foot stick 26.72 lb. Run 120 feet of #4 end to end and you are placing 80.16 lb of bar whether it comes as six 20-foot sticks or three 40-foot sticks. Any savings come from what happens around the bar: joints, offcuts and handling.

Where 40-foot bar helps

On a long run, the stick length sets how many joints you make. That same 120-foot run has five joints in 20-foot bar and two in 40-foot bar. Each joint is a lap or a coupler, and the engineer of record decides which one the job gets and how it is detailed. Fewer joints on a long grade beam, wall or slab mean less bar spent on overlap and less tying time. That is the plain case for 40-foot stock on big pours.

Where 20-foot bar helps

Twenty-foot bar is easier to move. A 20-foot #4 is under 14 lb, and even a 20-foot #8 is 53.4 lb, so it is the easier stick to move by hand. Forty-foot bar is twice the length and twice the weight, and it needs a trailer that can carry a 40-foot load safely. If you are picking up at the yard, that matters before you leave the lot. If the job is a smaller pour or has short runs, 20-foot bar often fits the work without much cutting.

Site access is the other half. Think about how a truck gets in, where the steel will be staged and who meets the driver. A long bundle that cannot reach the pour is not saving anyone anything.

Where the waste really comes from

Offcuts depend on the length you cut against the length you buy. Here is general shop math, not a River City figure:

  • Eight-foot pieces: a 20-foot stick gives you two and leaves 4 feet. A 40-foot stick gives you five and leaves nothing.
  • Ten-foot pieces: either stick cuts with no leftover.
  • Twelve-foot pieces: a 20-foot stick gives you one and leaves 8 feet. A 40-foot stick gives you three and leaves 4 feet.

Some offcuts find a use somewhere else on the job, and some do not. The point is that the piece length on your plans, not a rule of thumb about stick length, tells you which stock wastes less. The same drawing also tells you where the joints fall, which is why the length question belongs on the drawings and not only on the order.

Or skip the choice

You do not always have to buy straight stock and cut it in the field. River City Reinforcing cuts and bends rebar to the engineered plans, sized to the project so less steel ends up as scrap, and the detailers on the shop-drawing side work out the quantities and lengths from the plans. On the stock side, the yard carries domestic and import bar in both 20-foot and 40-foot lengths, along with corner bars, stirrups and dowels, and a few bundles get the same phone call as a full job.

What to bring to the call

If you are deciding between the two, have these ready:

  • The bar sizes and the longest continuous runs on the plans.
  • The piece lengths you expect to cut, if any.
  • How the steel will get to the job: your trailer, or our truck.
  • Anything unusual about site access.

Joint type, joint locations, spacing and cover all come from your engineer of record. Treat anything here as background for the conversation, not as a spec.

Send your plans through our send plans page or call the office at (210) 775-0609, Monday to Friday, 8 a.m. to 5 p.m. We will talk through the lengths with you and quote it from there.

Send us the plans.

Attach the engineered drawings or a bar list and tell us about the job. Rather talk it through? Call the office. One person picks up, and they know rebar.